Friday, September 14, 2018

Engineering in Action on the Eastern Metropolitan Bypass

 

The Eastern Metropolitan Bypass has resembled a giant construction zone for quite some time now, as work on the Orange Line of the Kolkata Metro Railway continues to reshape the city's landscape. While many see traffic diversions and construction barriers, I often find myself fascinated by the incredible machinery making this transformation possible.

On a recent drive, I couldn't resist stopping to get a closer look at a truck-mounted telescopic crane hard at work at the upcoming Jyotrindra Nandi Metro Station, currently under construction just outside Metro Cash & Carry.

Watching the crane effortlessly lift and position massive construction materials was a reminder of the engineering precision and teamwork involved in building modern urban infrastructure. These powerful machines may not attract as much attention as the trains that will eventually run on the line, but they are the unsung heroes turning ambitious plans into reality.

For anyone with an interest in heavy equipment or engineering, the Orange Line construction offers plenty of opportunities to witness these remarkable machines in action as Kolkata moves one step closer to a more connected future.

Meet the HYDRA 830M

The Hydra 830M is a mobile truck crane manufactured for heavy lifting operations.The equipment is well known for its versatility, compact design and powerful performance, making it a perfect fit for infrastructure and construction projects. The truck has the right combination of safety and comfort. A steel construction full-width cab with an electric fan, interior light, horn, and opening window fitted with toughened glass ensures the operators work in absolute comfort. The Hydra 830M has advanced tracks or wheels that allow it to navigate obstacles with stability and ease.

Specifications

Thursday, March 16, 2017

My Ertiga ZXi goes in for Servicing

 

My Maruti Suzuki Ertiga ZXi brought in for regular servicing at Dewar's Garage. I took a walk to Chandni Chowk Metro Station and took the Metro back home. It's actually one of the most convenient ways to get back home from here.


Thursday, April 19, 2012

Dum-Dum - New Garia Metro: The First Pile is driven in

Over the past couple of weeks, I have noticed how the trees have been chopped down in the central verge of the E. M. Bypass near my place. Then came the heavy machinery, Bulldozers, Excavators, Cranes and Pile Drivers. With them the workers with their yellow helmets.

Several days ago I had posted (Metro work on Garia-Dum Dum line starts) and below are pics of the progress. The first pile being driven in.



Work on this is going on around the clock. Am looking forward to using this in a year or two.

Thursday, April 12, 2012

Metro work on Garia-Dum Dum line starts


Work on the New Garia - Dum Dum metro line has started on the E. M. Bypass right outside my place. The central verge has been cleared and the piling has started. It was sad to see the trees being chopped down to make way for progress.

Wednesday, June 15, 2011

Progress on Metro at Salt Lake


My wife took pictures from here office terrace with her Nokia E63 and I used Panorama Composer to put this together. Towards the left is Kuranamoyee and right is Salt Lake City Center. As you can see the work is going on at lightening sped and on the left is a station being built. I'm guessing it's goign to be the Karunamoyee stop.

Thursday, February 17, 2011

Fantastic Pace on the Metro E2W Corridor Construction

In front of City Centre, Salt Lake.
Outsite City Centre, Salt Lake. Station Construction in full swing.
Infront of Mani Square Mall, E. M. Bypass
E. M. Bypass

Sunday, June 27, 2010

Kolkata Metro E2W Corridor is progressing

Construction on the East2West Metro is happening at a really good pace, not by Kolkata standards, but by any standard. I'm a bit shocked, yet happy that Construction can happen this fast in Kolkata.

Am just looking forward to seeing all this construction culminating into a better Kolkata.






Thursday, July 16, 2009

Kolkata Metro: Connect East2West Project

Finally Work has started on the East2West Metro. This is an ambitious project which entails connecting Howrah to Salt Lake. The proposed line is interesting as it will have underground and elevated sections.

I think the biggest challenge will the the section that will be a tunnel under the River Hooghly connecting Howrah Station to the Metropolis of Kolkata. Once completed thought, I think it will take the much needed load of off the Historic Howrah Bridge.

Lets see how long this project takes. The original Metro, India's first, took 22 years and is now being extended beyond Tollygunge on the south till Garia and beyond Dum Dum to Barrackpore, I hear.

This is the section on the E.M. Bypass in front of Mani Square Mall.